Fact Sheet

Planned Capacity: ~3 million volume equivalents
Construction completion: October 31, 2003
First items loaded: January 12, 2004
Footprint: 34,533 nsf, including: Processing areas: 8,256 nsf;
3 modules at 7,837 nsf each (23,511 nsf total storage)
Acreage of site: 2.87 acres of 5.81-acre purchase; 50 miles from campus.
Storage: 17,578 shelves, 53 wide x 36 deep
72 flat file cases, 15 drawers each
Environmental set points: 50 F (+/- 1); 38% RH (+/- 3%);
Physical materials: Books, manuscript and record storage boxes, magnetic and other media; flat and rolled materials
Current Staffing: One manager, one driver, four loading staff
Hours of operation: 6:00 a.m.-3:00 p.m., Monday-Friday
Load rate: ~7,500 books per week for 4 FTE load staff; or
~3,500 archive boxes per week
200,551 items to date (August 17, 2004)
Paging: Order via OPAC by 11 a.m., delivered next day, Mon. Fri.
Architect: MBT Architecture, San Francisco, CA
http://www.mbtarch.com
General Contractor: Devcon Construction, Inc., Milpitas, CA
http://www.devcon-const.com
Stanford Contact: Rebecca Pernell, Head of Access Services
pernell@stanford.edu
http://library.stanford.edu/depts/accsrvc/sal3/


Last modified: March 3, 2010

   
seal © Stanford University. Stanford, CA 94305. (650) 723-2300. Terms of Use | Copyright Complaints
[an error occurred while processing this directive]