Our Project

The initiative began with a brainstorming session on November 20, 2003 organized by the Department of Civil and Environmental Engineering (CEE) in which faculty, students and invited professionals developed the initial vision for an “evolving”, “influential”, “flexible”, and “desirable” living and learning facility. The proposal advanced through the work of Engineering students and faculty, peer review by outside professionals, and the efforts of several univeristy entities including Student Housing and Land and Buildings. A design team led by EHDD Architecture was selected in August 2005 to spearhead the Feasibility Study.

The Living Lab is not only about the final building for Stanford, but also about research into building technology, design processes, and collaboration.