The year is 2010. The Mountain Ridge University is one of the major research universities in the States. The University decided to build a new classroom and lab facility on their compus. The facility should support innovative courses which take a team approach to engineering design. The facility should function as a partially independent research and education center. Since the Wrold Wide Web (WWW) / Internet is a commodity, the University decided to place an announcement and a call for letters of intent in response to the call for bids on the WWW.

Call for Letters of Intents from AEC Teams in Response to the following Request for Bids.

To Architect, Structural Engineers, Construction Manager, MEP, and LCFM consultants: The Mountain Ridge University plans to build on its campus a new classroom and lab facility to educate a new generation of Agile AEC Professionals.

Apprentices with an interest in landscaping in mountain areas are welcome to apply.

Following are some site characteristics and facility requirements:

  • Landscaping in the mountain area where the site of the future building is.
  • Linear building structure for the special energy conservation requirements of the building.
  • Steel structural system solution which addresses all the earthquake design code requirements for the specific mountain area.
  • Planning, scheduling, cost estimating and construction of the steel building to be built.
  • MEP experts in building monitoring systems.
  • Cash flow and risk management of steel structure buildings.

 

Electronic documentation requirements:

  • Architectural design solutions should be presented in: PhotoShop, AutoCAD.
  • Structural design evaluation should be performed using: DRAIN 2DX and ETABS.
  • Construction management documents should use: Timberline and EXEL.
  • Risk management modeling of steel structure buildings.