River Project

General Description

The year is 2010. The Mississippi Riverbank University is one of the major research universities in the States. The University decided to build a new classroom and lab facility on their campus. The facility should support innovative courses which take a team approach to engineering design. The facility should function as a partially independent research and education center. Since the World Wide Web (WWW) / Internet is a commodity, the University decided to place an announcement and a call for letters of intent in response to the call for bids on the WWW.

Call for Letters of Intents from AEC Teams in Response to the following Request for Bids.

To Architect, Structural Engineers, Construction Manager, MEP, and LCFM consultants: The Mississippi Riverbank University plans to build on its campus a new classroom and lab facility to educate a new generation of Agile AEC Professionals.  

We also accept apprentices that are interested in design of historic buildings style design.

Following are some site characteristics and facility requirements:

  • Landscaping in the riverbank area where the site of the future building is.
  • Historic building style design.
  • Stone structural system solution which addresses the design requirement for flooding areas.
  • Management of multi-organizational project teams.
  • Planning, scheduling, cost estimating and construction of the stone building to be built.
  • MEP experts in designing under floor systems.
  • Cash flow and risk management of historic stone buildings.

Electronic documentation requirements:

  • Architectural design solutions should be presented in: 3D Studio and AutoCAD.
  • Structural design evaluation should be performed using: DRAIN 2DX and ETABS.
  • Construction management documents should use: Timberline and EXEL.
  • MEP: DoE-2
  • Cash flow modeling tools.