To: Larry Tesler and Distribution
From: Dave Evans
Re: P3 Mouse Deliveries
Date: 17 March 1981
MEETING IN PASCAL IN DE ANZA AT 3:00 PM ON FRIDAY MARCH 20
FOR DELIVERY AND PRESENTATION OF LATEST BATCH OF MICE.
BRING YOUR OLD MOUSE AND TRADE IT IN ON THE MOST CURRENT MODEL!!!
The long awaited P3 improved interim mouse is here. It has an injection molded case and button. The insides are somewhat different from the final production units, but only in design, not output.
There are a few differences in feel and appearance between the P3 mouse and the final unit which will be discussed. Please come to hear about the mouse status and our interest in gaining final input from you all through your experience with your new P3 mouse.
We will have mouse designers there to answer your question
and the one and only complete confirmation model of the final
unit, so you can see what the future
holds.
Don't it or you'll be the only one on your block without the latest in Apple Mouse Technology.
3:00 to 3:30 Mouse Review and Demonstration of production mouse confirmation model
3:30 to 4:00 Questions and Mouse Distribution (trade-ins only please)
Lisa and Lucy Software Lab Members
F. Baker
P. Lapson
D. Hovey
D. Dresselhaus
D. Dayton
T. Hawkins
W. Rosing
G. Marten